House List
We actually did it!!! After much talking and crying wolf many times we finally put our money where our mouth is and bought a house. In Ireland. So we will definitely be moving home. Its been on the cards for so long now it seems a little weird to be actually happening. John has a few contracts to finalize before we leave so the moving date probably won't be until February. But that's fine as the house needs plenty of work before we move in. We got a really great deal but the trade off is that it's missing quite a few necessities, like a kitchen for one. Think we ave a diamond in the rough though and the most important thing is its open plan and large enough to accommodate Ryan's equipment and needs.
Following is a run down of the major projects we need to undertake before move in date.
DOWNSTAIRS HALLWAY
To Do:
Paint walls, trim, stair risers and spindles
Metallic grass cloth for feature wall
Stain floors
Trestle table for side of stairway
Mirror for wall
Add double doors to arches room
Replace light
Fill in cupboard opening under the stairs?
Move bathroom over to right and make new hallway for new front door (phase 2)
UTILITY ROOM
To Do:
Window coverings
Sink / washing machine / dryer
Install cabinets
Paint walls and trim
Box in furnace
Salvage floor tiles
PANTRY
To Do:
Close up door and install new window
Install shelves
Paint walls and trim
Clean floor
KITCHEN
To Do:
Search for tiles to match floor
Cabinets, appliances etc
Switch position of window and patio doors
Back splash
Stools for island
Table and chairs
2 pendants for over sink
Orb chandelier for over island
Paint walls and trim
DINING ROOM
To Do:
Fix hump in floors
Refinish and stain floors
Paint built in cupboards white, maybe back inside in darker color or wallpaper
Paint walls and trim
Table and chairs
Sideboard
Hang art
Rug
Light
CONSERVATORY
To Do:
Fix leak in roof
Plaster over awful mosaic tile
Paint walls and trim
Install double doors to keep the heat in
Replace 2 glass panes with moisture bubbles in them
2 cream sofas
Rug
DIY ikat ottoman - purchase fabric and legs
Install TV on wall
2 large potted plants
Change to sun room (phase 2)
LIVING ROOM
To Do:
Repair floor boards that have lifted
Clean and restrain floor
Paint walls and trim
Clean chimneys
Remove wall paper around fireplace. Insert fire place into wall and redo surround. Maybe brick or wallpaper?
Purchase stove, install mantle
Hang TV
Sectional sofa, coffee table, rug
Install bookcases in nook, reading chair
ARCHES ROOM
To Do:
Clean and re stain floor
Paint walls and trim
Window coverings
Table / balloon back chairs
Grey bookshelves
2 large hanging shades over table
Chair for corner
DEN
To Do:
Install carpet
DIY wood fireplace
Stove or open fire?
Remove TV stand in corner
Window coverings
Paint walls and trim
DOWNSTAIRS BATHROOM
Phase 1
Install toilet and sink
Phase 2
At some point in the future this bathroom will become our new front door / hallway and we will move the bathroom to the right. At that point we plan to install a complete wet room including large changing station for Ryan
PLAYROOM
Rug
Light fixture
Remove built in bench
Paint walls and trim
UPSTAIRS HALLWAY
To Do:
Paint walls and trim
Replace carpet
install doors
spray paint light fixtures or replace
install master bedroom closet
GUEST BEDROOM
To Do:
Install missing baseboard
Clean floor
Paint walls and trim
RYAN'S BEDROOM
To Do:
Install closet or replace missing floorboards
Window coverings
MAIN BATHROOM
To Do:
We haven't decided but we may remove the bath and put a large shower with bench along complete length of window wall
Install sink and toilet
Repair missing tiles
Paint walls and trim
SECOND GUEST BEDROOM
Install closet or replace missing floorboards
Paint walls and trim
Window covering
MAIN BEDROOM
To Do:
(a pic of our awesome realtor that went above and beyond to get us this house)
Paint walls and trim
Window covering
Light fixture
Fabric headboard / side tables
The mirror doors to the right are covering built in closets and the entrance to the master bathroom! We intend to remove these to make the room larger (and the secret bathroom is a little creepy to me)
MASTER BATHROOM
To Do:
PHASE 1:
Paint walls and trim
Change mirror
PHASE 2:
Complete renovation
GARAGE
To Do:
The garage is currently converted into 2 rooms down stairs and another room and a bathroom upstairs. For the immediate future we will just clean and leave as is. In the future we plan to make one of the rooms an accessible bedroom for my brother which will entail widening doors etc, and redecorate the bathroom and office upstairs.
Comments